Barriers to Supply Chain Integration with Building Information Modeling in Prefabricated Construction in Jordan
The integration of Building Information Modeling (BIM) with Supply Chain Integration (SCI) holds significant promise for optimizing the prefabricated construction sector. This study has explored the barriers facing this integration within Jordan's prefabricated construction industry. Through a comprehensive survey of professionals, this study has shed light on the unique challenges encountered in this region. The results indicate that while considerable awareness of the potential advantages of BIM-SCI integration exists, various obstacles, such as inadequate technological infrastructure, lack of standardized protocols, limited skilled personnel, cultural factors, and organizational resistance, hinder its widespread adoption. Comparatively, some of these barriers mirror global challenges, but the intensity and the nature of a few are region-specific. By understanding these barriers, stakeholders can devise strategies to facilitate a more streamlined integration of BIM with SCI, ensuring improved efficiency, cost savings, and overall project success in the prefabricated construction domain of Jordan. Copyright ? 2026 Praise Worthy Prize S.r.l. - All rights reserved.
Publishing Year
2026